Saturday, November 7, 2009

Installing the cabinets.


Today and tomorrow the cabinets are being installed and on Monday the granite will be installed. Because we have chosen under cabinet lights we had to cut out holes for the plugs, this made the process go a little slower than I would have liked. Some of the major changes to the design are shifting of the stove, microwave and refrigerator.  Saturday I will be working on getting the bottom cabinets in and putting plywood base for the granite.

Posted by Picasa

No comments:

Post a Comment